Epoxy coal tar zinc paint

This paint is a two-component system. Component A consists of epoxy resin, coal tar pitch, zinc-containing pigment, anti-corrosion pigment, additives, solvents, etc. Component B is the curing agent.

Keywords:

Product Inquiry:

Product Description

Epoxy Coal Tar Zinc Paint

  This paint is a two-component system; component one consists of epoxy resin, coal tar pitch, zinc-containing pigments, anti-rust pigments, additives, solvents, etc., and component two is the curing agent.
   Characteristics
  Epoxy coal tar zinc paint has good mechanical properties, excellent water resistance, and outstanding anti-corrosion performance.
   Uses
  Suitable for anti-corrosion of inner and outer walls of underground pipelines, sewage treatment tanks, inner walls of seawater and freshwater pipelines, and non-external chemical equipment.
   Technical Requirements

Item Index
Color and Appearance Various colors, smooth and flat paint film
Viscosity (Coating-4) 25℃ S 60
Solid content % 50
Drying time: h Surface dry h 4
Hard dry h 24
Adhesion level 1
Impact strength kg/cm 50
Water resistance 24h No blistering, no peeling

   Construction Reference
  1. The surface to be coated should be clean, dry, free of dust, grease, rust, etc.
  2. The substrate temperature should be 3℃ above the dew point temperature. When the substrate temperature is below 5℃, the paint film is difficult to cure and should not be applied.
  3. After Component A is evenly stirred, prepare according to the ratio of A:B = 100:10. After curing for 15-30 minutes, adjust the viscosity with a special thinner before application.
  4. The prepared paint should be used within 8 hours. Prepare it as needed to avoid waste.
  5. To ensure anti-corrosion performance, apply more than three coats. The dry film thickness should reach more than 100 micrometers.
  6. The ambient construction temperature has a significant impact on drying. The recoating interval should be determined based on the drying condition of the coating.
  7. The construction site should be well-ventilated, away from sources of ignition, and construction personnel should wear appropriate labor protection.
   Storage and Transportation
  The storage period is one year, and transportation should comply with relevant regulations of the transportation department.