Products
搜索历史清除全部记录
最多显示8条历史搜索记录噢~
All
  • All
  • Product Management
+
  • undefined

Epoxy zinc phosphate primer

Composed of epoxy resin, zinc phosphate, pigments, fillers, additives, solvents, and curing agents, it is a two-component anticorrosive primer.

Keywords:

Product Inquiry:

Product Description

Epoxy Zinc Phosphate Primer

  Composed of epoxy resin, zinc phosphate, pigments, fillers, additives, solvents, and curing agents, it is a two-component anti-corrosion primer.
   Usage
  Excellent rust resistance, oil resistance, and salt spray resistance. Suitable as an anti-corrosion primer for steel structures such as gas tanks, underground pipelines, chemical equipment, and engineering buildings.
   Technical Specifications

Item Indicator
Color and appearance Various colors, smooth and even paint film
Viscosity (Coating-4) 25℃ S 60
Solid content % 50
Drying time: h surface dry h 4
Hard dry h 24
Adhesion level 1
Impact strength kg/cm 50
Water resistance 24h No blistering, no peeling

   Construction Reference
  1. The surface to be coated should be dry, clean, and free of dust, oil, moisture, rust, etc.
  2. The substrate temperature should be 3℃ above the dew point temperature.
  3. After component A is stirred evenly, prepare according to the ratio paint:curing agent = 100:10, stir evenly, let it stand for 15-20min for maturation, then adjust the viscosity with a special thinner before application.
  4. Spraying, brushing, or roller coating are applicable methods.
  5. The prepared paint should be used within 6 hours to prevent curing and waste.
  6. Ambient temperature significantly affects paint film drying; do not apply below 10℃. The recoating interval should be determined based on the drying condition of the paint film. At 20-25℃, the interval is 12-24 hours.
  7. Tools used should be cleaned promptly for future use.
  8. The construction site should be well-ventilated, away from sources of fire, and construction personnel should wear personal protective equipment.
   Storage and Transportation
  The storage validity period is one year. Transportation should comply with relevant regulations of the transportation department.

Related Products

Get a Quote

Note: We will contact you within one business day. Please pay attention to your email.

Security verification
Submit Now